by KF5ZXT » Mon Jul 30, 2012 10:58 am
I don't think anything else needs to be replaced by our self-imposed deadline. Just waiting on those bolts from McMaster for the lower kingpin, then thing should move pretty quickly, provided I could get some time to work on it, haha. My family has been a little demanding of late for their projects. Didn't get home til Justin's lunch time (midnight) last night from doing more electrical at pop's place. Still have about three more lighting circuits to wire over there.
Other than just basic disassembly/assembly, all I have to do is drill the outer wheel shells for the new valve stems I got (uses a 5/8" hole), and to tap the passenger side lower king pin for a normal sized zerk fitting (I have been unable to find a match for it at this point). Oh, and I am waiting on one other part, but it is very easily added on at a later date.